UK comparison

Similar numbers. Different duties.

The stage, trigger, tenancy and hazard matter as much as the number of days. Compare the frameworks without treating their response periods as interchangeable.

Official sources checked . Review due — check the original sources before relying on this status.

On a smaller screen, scroll the table horizontally. Full accessible nation pages are linked in each column.

Comparison of scope, status and response stages as checked on 27 Sep 2026
What to compareEngland ↗Scotland ↗Wales ↗Northern Ireland ↗
FrameworkAwaab’s Law in social housingA separate Scottish Awaab’s LawWHQS hazard-response requirementsFitness standards and housing quality reform
Status at this checkPhase 1 in force

Phase 1 in force. Phase 2 intended for 30 November 2026; approval pending.

Commences 6 October 2026

Different legislation. Different repair milestones.

In effect from 1 April 2026

Wales uses its own housing quality framework.

Separate existing framework

Do not apply an English or Scottish timetable here.

Landlord / tenancy coverageRelevant social tenancies let by registered providers, including councils and housing associations. Not a blanket rule for all rented homes.

Licences, long leases and shared ownership are not automatically covered by this social-tenancy regime. Private-rental reforms and other repair duties need separate checks.

Accommodation within the Scottish Right to Repair Scheme or Repairing Standard: social tenancies and much of the private rented sector, with statutory exclusions.

Coverage depends on the tenancy and legislative route. The guidance separately discusses temporary accommodation and Gypsy/Traveller sites. Check the official scope rather than assuming every occupancy agreement is included.

The WHQS responding-to-hazards rule is for social housing. Wider fitness duties under the Renting Homes framework are a separate consideration for rented homes.

The WHQS rule has a specific social-housing scope and landlord-control conditions. Other housing, fitness, safety and repair obligations are not displaced.

Existing Northern Ireland housing fitness and landlord repair frameworks. The proposed revised Decent Homes Standard is a separate social-housing reform.

Avoid treating consultation proposals or another nation’s standards as Northern Ireland law.

Response stages

Emergency hazards
As soon as reasonably practicable; investigation and relevant safety work both within 24 hours of awareness.

Potential significant damp/mould
Investigation within 10 working days of awareness.

Investigation summary
Provide within 3 working days of the investigation concluding, subject to the Regulations’ exceptions.

Significant hazard: safety work
Within 5 working days of the investigation concluding.

Prevent recurrence
Begin or take steps to begin within 5 working days; physical start as soon as reasonably practicable and within 12 weeks. Complete within a reasonable period.

Alternative accommodation
Secure suitable accommodation at the landlord’s expense when the relevant safety work cannot be completed within the required timeframe.

Investigate damp or mould
A competent person investigates within 10 working days of awareness.

Written findings
Summary to the tenant or representative within 3 working days after investigation concludes.

Substantial damp/mould: start repairs
Commence repair work within 5 working days after the investigation concludes.

Social-landlord completion
Complete within a maximum of 20 working days from repair commencement.

Private-landlord completion
Complete as soon as reasonably practicable; no equivalent blanket 20-working-day maximum.

Exceptional circumstances
The Scottish provisions require notification, reasons, a revised timeframe and reasonable interim steps where compliance is prevented by circumstances beyond the landlord’s control.

Significant risk with imminent harm
Investigate within 24 hours; remedy within a further 24 hours. Make-safe work should be as soon as possible.

Significant risk without imminent harm
Investigate within 10 working days; remedy within a further 5 working days.

Where timely remedy is not possible
On the assumption of best endeavours, provide the required written summary plan within 5 working days. This is not a general exemption from action.

Reporting
The addendum includes quarterly and detailed WHQS compliance reporting requirements.

Awaab-style fixed deadlines
No equivalent timetable established by the official sources listed here.

What to check instead
The tenancy, applicable fitness and repair duties, the landlord’s repairs service and subsequent official guidance.

Do not confuseThese are maximum response periods, not permission to delay. Triage is not an extra grace period. A formal complaint is not required to report a hazard.Faster duties under other legislation still apply. Do not import England’s emergency or accommodation rules into Scotland. A mould wash alone may not address the underlying cause.The Welsh imminent-harm rule is not England’s single 24-hour investigation-and-make-safe clock. Read the addendum’s definitions and conditions before using a deadline.A missing Awaab-style timetable is not an absence of housing duties. Do not display “not applicable” in a way that suggests serious disrepair can be ignored.